GAMP Lifetechhome page

Line Clearance System

Line clearance completed and verified in the system, with colour e-paper tags on rooms and equipment showing their current status in place of handwritten labels.

Download the LCS product sheet (PDF, 185 KB)
The LCS clearance checklist for Filling line 2 on a tablet, completed by production and verified by QA e-signature, with the colour e-paper tag reading Cleared and the previous tag reading To be cleaned

Overview

What is line clearance?

Line clearance is the check that a line, room or piece of equipment holds nothing from the previous batch — no product, components, labels or documents — before the next batch starts. It is one of the main controls against mix-ups and cross-contamination.

On paper, the clearance is a checklist signed at the line, and the status of each room and machine is a handwritten label hung on it. Labels go missing, are not updated, or still say “cleaned” after the equipment has been used again.

LCS runs the checklist and its QA verification in the system, and shows each room’s and machine’s status on a colour e-paper tag that the system updates itself.

Was this line really cleared — and is the label on it still true?

In GAMP LCS:

  1. Batch complete: The line is ready for changeover
  2. Cleared: Checklist completed by production
  3. Verified: Checked by QA, signed electronically
  4. Tagged: E-paper tags updated by the system
  5. Released: The line is ready for the next batch

Every changeover runs the same clearance

Why GAMP

Why teams choose GAMP LCS

Cleared, then verified

Each changeover runs its own line clearance checklist, completed by production and verified by QA with an electronic signature.

Audit trail on every action

GAMP LCS · in this workflow

  • Line clearance checklists for each line, room and changeover
  • Completed by production, verified by QA with e-signature

Status where people look

Colour e-paper tags on rooms and equipment show their current status, and change the moment it changes in the system — no handwritten label to update.

E-signatures under 21 CFR Part 11

GAMP LCS · in this workflow

  • Colour e-paper status tags on rooms and equipment
  • Tags updated from the system the moment a status changes

Every clearance on record

Each tag shows the previous product, batch and cleaning status, and every clearance stays on record for the line and the batch.

Role-based access on every record

GAMP LCS · in this workflow

  • Previous product, batch and cleaning status shown on each tag
  • A complete clearance history for every line and batch

The complete system

Status on the door, set by the system

LCS drives colour e-paper tags and displays from GAMP. When a line clearance is completed and verified, the tags on rooms and equipment change to match — no handwritten labels.

1In your facility

GAMP hardware

2GAMP software

The module and its base

3What you get

From the record

Hardware · GAMP

Colour e-paper tags

Hung on rooms and equipment, each showing its current status.

How it connects

GAMP LCSstatusColour e-paper tags
1 of 7
GAMP hardware

LCS works with GAMP tags and displays only.

Hardware is supplied by GAMP Services Limited, our parent company. Buy the software on its own or as the complete system through us; hardware on its own through GAMP Services Limited.

Where it sits

One module of AsepticOne

AsepticOne’s modules share single sign-on and one administration layer, and entry, intervention and clearance records can be linked across them.

AsepticOne overview

Benefits

What GAMP LCS gives you

Across AsepticOne

  • One record of the sterile core

    Entry, interventions and line clearance are recorded on one platform, so an investigation starts from recorded facts rather than recollection.

  • Administered once

    Operators, supervisors and QA reviewers are set up once for AICS, ACAS and LCS, and removed once when they leave.

  • Every changeover cleared the same way

    The same checklist runs whoever is on shift, so a clearance never depends on someone remembering the steps.

  • Labels that stay true

    E-paper tags change when the status changes in the system, so a room or machine never shows yesterday’s status.

  • The facts at the equipment

    People at the line read the last product, batch and cleaning status off the tag: the same facts the system holds.

  • QA’s signature, not a tick on paper

    Each clearance is verified by QA with an electronic signature before the line is released.

  • A history for every line

    Past clearances can be pulled up by line or by batch whenever a reviewer or an inspector asks.

  • A control against mix-ups

    Every changeover checks for the previous batch’s product, components, labels and documents before the next one starts.

FAQs

Questions teams ask before they start

Is it compliant with 21 CFR Part 11 and EU Annex 11?

It provides the technical controls both regulations require: unique logins, a secure computer-generated audit trail on every action, e-signatures that record who signed, when and what the signature means, and role-based access on every record. Compliance also depends on how the system is validated and used at your site.

Which regulations and standards is it built against?

EU Annex 11 and 21 CFR Part 11 for electronic records and signatures; GMP, including EU GMP Annex 1 for sterile manufacture; WHO GDP for storage and distribution; GAMP 5 for the validation approach; ALCOA++ for data integrity; and ISO/IEC 17025 for calibration.