GAMP Lifetechhome page

GAMP 5, explainedA risk-based approach to validating computerised systems

GAMP 5 is ISPE's guide to making computerised systems fit for GxP use. It is not a regulation, but it is the method most regulators expect to see behind a validation. Its message: put the effort where the risk to patients, product and data is, and build on the supplier's work instead of repeating it. (A note on names: GAMP 5 is ISPE's guide; GAMP Lifetech is a separate company whose name shares the word.)

Issued by
ISPE, as "ISPE GAMP 5: A Risk-Based Approach to Compliant GxP Computerized Systems (Second Edition)"
Applies to
Computerised systems used in GxP work. Written for regulated companies, their suppliers (IT service providers included) and regulators
Editions
First Edition 2008; Second Edition July 2022

In plain words

What GAMP 5 is about

GAMP stands for Good Automated Manufacturing Practice. The guide sets out how to specify, verify, operate and retire computerised systems so that they are fit for their intended use and meet GxP requirements such as Part 11 and Annex 11.

Its key ideas: understand the product and the process; follow a lifecycle within your quality management system; scale the effort to risk, complexity and novelty; use science-based quality risk management; and involve suppliers, using their documentation and expertise.

The Second Edition (2022) keeps that framework but puts critical thinking by knowledgeable, experienced experts ahead of paperwork. It gives service providers a bigger role, fully supports iterative and incremental development, makes more use of software tools and automation, and expands its appendices on AI and machine learning, cloud computing, blockchain and open-source software. It also discusses FDA's work on Computer Software Assurance. That guidance, finalised in September 2025 for medical device production and quality system software, points the same way: concentrate assurance where failure would affect patients or product, and use lighter, unscripted testing where risk is low.

What it asks for

The requirements, clause by clause

  1. Lifecycle

    Concept, project, operation, retirement

    Every system moves through four phases under the regulated company's quality management system, with activities defined for each.

  2. Specify

    Requirements first

    User requirements describe what the system must do for its intended use; further specifications are scaled to risk and complexity.

  3. Risk

    Focus on what matters

    Identify the functions that affect patient safety, product quality and data integrity, and concentrate verification there.

  4. Verify

    Test at the right depth

    Verification effort matches risk. Adequate supplier testing is used rather than repeated.

  1. Suppliers

    Leverage the supplier

    Assess suppliers, then use their documentation, testing and knowledge instead of duplicating them.

  2. Operate

    Keep it validated

    Change and configuration management, incident and CAPA handling, periodic review, backup and restore, and business continuity.

  3. Retire

    Retire without losing records

    Migrate or archive data so records stay available and readable for their retention period.

  4. 2nd ed.

    Critical thinking

    Each activity is justified by what it adds to patient safety, product quality and data integrity, not by habit.

Where inspections find gaps

Where sites usually slip

  • Everything tested to the same depthThousands of scripted steps on low-risk functions, while the functions that matter get no more attention.
  • No thread from requirement to testUser requirements, risk assessment and tests that cannot be traced to one another.
  • Supplier work ignored, or taken on trustSupplier documentation repeated from scratch, or relied on without assessing the supplier.
  • Drift after go-liveChanges made without impact assessment, and no periodic review.
  • The wrong categoryA configured product treated as custom code, or as if it needed no validation at all.

What to ask of software

Questions for any vendor

0 of 5
Ask for a demonstration of each, not a yes.

At a glance

GAMP 5 software categories

A category describes how standard or bespoke software is. It is one input, alongside risk, into how much lifecycle work a system needs, not a risk rating, and real systems usually combine components from several categories. Category 2 (firmware) was dropped when GAMP 5 first appeared in 2008; firmware is treated according to what it does.

GAMP 5 software categories
CategoryWhat it isTypical approach
1: Infrastructure softwareOperating systems, databases, middleware, network and security softwareRecord versions, install correctly, and qualify the infrastructure
3: Non-configuredSoftware used as supplied, set up only by run parametersVerify it meets your requirements; lighter, risk-based testing that builds on supplier evidence
4: ConfiguredSoftware configured to your business process, such as an eQMS, a LIMS or a monitoring systemVerify the configuration and the processes it supports; assess the supplier; risk-based testing
5: CustomSoftware written specifically for youFull lifecycle, including design and code review and more extensive testing

Where GAMP Lifetech helps

The modules behind GAMP 5 records

Every GAMP Lifetech module keeps its own computer-generated audit trail, electronic signatures and role-based access, with single sign-on across the suite through System Administrator.

Each release ships with a validation package, so your team builds its own risk-based validation on supplier evidence instead of starting from a blank page.

FAQs

Questions people ask about GAMP 5

Is GAMP 5 mandatory?

No. GAMP 5 is an industry guide from ISPE, not a law. But regulators expect a risk-based, documented approach to computerised system validation, and GAMP 5 is the most widely recognised way to show one.

What are the GAMP 5 software categories?

Category 1 is infrastructure software, Category 3 is software used as supplied (non-configured), Category 4 is software configured to your process, and Category 5 is custom software. The higher the category, the more lifecycle activity is usually needed.

Why is there no GAMP Category 2?

Category 2 covered firmware. It was removed when GAMP 5 was published in 2008, because firmware can be anything from a simple instrument to a configurable controller; it is now treated according to what it actually does.

Which GAMP category is a LIMS or a spreadsheet?

It depends on how the software is used, not on the product type. A LIMS configured to your workflows is usually Category 4, and custom code added to it, such as bespoke reports or scripts, is treated as Category 5. A spreadsheet program is commonly treated as infrastructure, while a spreadsheet built in it is judged by its complexity: simple use of built-in functions sits at the low end, and macros or custom code put it in Category 5.

How does GAMP 5 relate to Part 11 and Annex 11?

Part 11 and Annex 11 set the requirements a computerised system must meet; GAMP 5 is guidance on how to meet them and show it. Annex 11's own expectations, risk-based validation across the lifecycle, supplier assessment, change control and periodic evaluation, are the backbone of the GAMP 5 method, which is why a validation built on it is widely accepted in inspections.