Multi-site change control without divergence
How one change record carries an impact assessment across every plant it touches, and why site-by-site handling fails.
Where several plants make the same product, a change raised at one of them belongs to all of them. A new excipient supplier, a tighter cleaning limit, a revised assay: each touches every site that makes the product, and at a contract manufacturer every client whose product shares the line. Handled site by site, the same change is assessed several times, approved on different timetables and written into different versions of one procedure.
This guide shows how to run it as one change record with a local tail for each site: what ICH Q10 and Q12 ask of change management across sites, what FDA’s quality agreement guidance and EU GMP Chapter 7 expect between contract givers and acceptors, where the global assessment ends and the local one begins, and how to keep documents in step so that any difference between sites is a decision, not drift.
Inside this guide
- 01How site-by-site handling drifts
- 02What a change system has to do
- 03The global change and its local tails
- 04Three rules that keep the model honest
- 05When the plant belongs to someone else
- 06Keeping documents in step
- 07Where GAMP Lifetech fits
Free to read
Leave a few details to open the guide
It opens on this page as soon as you send them, and so does every other piece in the library.

