Revised Schedule M, explainedIndia's GMP rules, rewritten to the global standard
Revised Schedule M is the GMP standard every drug manufacturer in India must now meet. Notified in December 2023, it brings Indian GMP close to WHO GMP: a pharmaceutical quality system, quality risk management, product quality reviews, controlled change, investigated deviations, effective CAPA and validated computerised systems. The last extensions ended on 31 December 2025, inspections against it are under way, and new draft amendments followed in October 2026.
- Issued by
- Ministry of Health and Family Welfare: Schedule M of the Drugs Rules, 1945, substituted by the Drugs (Amendment) Rules, 2023 (G.S.R. 922(E), 28 December 2023)
- Applies to
- Every licensed drug manufacturer in India. Part I applies to all; later parts add requirements for specific products, such as biological products and hazardous substances
- Enforced by
- CDSCO and the state drug regulators; inspections against it since the deadlines passed
In plain words
What Revised Schedule M is about
Schedule M is the part of India's Drugs Rules that defines good manufacturing practice. Its revised title is "Good Manufacturing Practices and Requirements of Premises, Plant and Equipment for Pharmaceutical Products". The original concentrated on premises, plant and equipment. The revision keeps that, and adds the quality-system approach of WHO GMP: Part I sets out the main principles for every manufacturer, from the pharmaceutical quality system to computerised systems. Later parts add requirements for specific product types, such as hazardous substances, biological products, radiopharmaceuticals and phytopharmaceuticals.
For most plants the biggest change is not the building but the system around it. Quality events must run as a connected process (deviation, investigation, CAPA, change control) with records that show it. Each product's quality must be reviewed regularly, and the computerised systems used in GMP must be validated and controlled.
The deadlines have passed. In November 2025 the Drugs Controller General of India asked state regulators to inspect manufacturers against Revised Schedule M and report back, and units that do not comply risk regulatory action. Further draft amendments were published for comment in October 2026.
What it asks for
The requirements, clause by clause
- Part I
Pharmaceutical quality system
A documented quality system with management responsibility, covering deviation handling, CAPA and regular product quality reviews of each product.
- Part I
Quality risk management
Risks to quality assessed and controlled systematically, with the effort in proportion to the risk.
- Part I
Change control
Every change assessed for its impact before it is made, approved, and tracked to completion.
- Part I
Qualification and validation
Equipment, utilities, processes, cleaning methods and computerised systems qualified or validated for their use.
- Part I
Complaints and product recalls
Complaints and adverse reactions reviewed and investigated, and a recall procedure that works when needed.
- Part I
Self-inspection and supplier audits
Regular self-inspection and quality audits, with suppliers audited and approved.
- Part I
Personnel and training
Qualified staff in key positions, trained for their work, with training kept current.
- Part I
Documentation
Controlled documents and complete records of every batch and activity.
- Part I
Good practices in quality control
Controlled sampling, testing, specifications and records in the QC laboratory.
- Part I
Computerised systems
GMP computerised systems validated, existing ones included; access to enter or change data controlled; manually entered critical data checked; and data backed up securely so none is lost.
Where inspections find gaps
Where sites usually slip
- A quality system on paper onlyProcedures exist, but there is no management review and CAPA is never checked for effectiveness.
- Shallow investigationsDeviations closed without a root cause, so the same deviation comes back.
- Change first, approval laterChanges made before they were assessed and approved.
- No product quality reviewNo PQR, or one that lists data without analysing the trends.
- Training behind the SOPsTraining records that do not match the current SOP versions.
- Uncontrolled systemsComputerised systems with shared logins, no audit trail or no backup.
What to ask of software
Questions for any vendor
At a glance
Revised Schedule M timeline
The dates that set where Indian manufacturers stand today, from the Gazette notifications and CDSCO's own list.
| When | What happened |
|---|---|
| October 2018 | Draft revision of Schedule M published for comment (G.S.R. 999(E)) |
| 28 December 2023 | Revised Schedule M notified in the Drugs (Amendment) Rules, 2023 (G.S.R. 922(E)) |
| 28 June 2024 | Deadline for large manufacturers (turnover of ₹250 crore or more): six months from notification |
| 28 December 2024 | Original deadline for small and medium manufacturers (turnover below ₹250 crore): twelve months |
| 11 February 2025 | G.S.R. 127(E): small and medium manufacturers could apply to the Central Licence Approving Authority in Form A within three months, with a section-wise gap analysis and an upgrade plan, for more time |
| November 2025 | The Drugs Controller General of India asks state regulators to inspect against Revised Schedule M |
| 31 December 2025 | Extended deadline for small and medium manufacturers ends |
| October 2026 | Draft amendments published for comment: Grade A microbial limits aligned with WHO (G.S.R. 953(E)), an authorised person responsible for batch release (G.S.R. 955(E)), and suspension of product permission for not-of-standard-quality drugs until CAPA is implemented (G.S.R. 956(E)) |
At a glance
From requirement to system
What each expectation needs day to day, and where software carries it.
| Revised Schedule M expects | Day to day, that means | GAMP Lifetech module |
|---|---|---|
| Deviations, CAPA, change control, complaints, audits | One closed loop, with root cause, effectiveness checks and impact assessment | QMS |
| Controlled documentation | SOPs, BMR/BPR and protocols issued under control; old versions withdrawn | DMS |
| Trained, current staff | Role-based training, with retraining when an SOP changes | TMS |
| Controlled computerised systems | Access granted, changed and removed through a recorded approval | UAM, System Administrator |
| Controlled storage conditions | Warehouses, cold rooms and stability stores monitored, with alarms | FMS, FMP |
| Quality control records | Samples, results and approvals recorded and traceable | LIMS (LabOne) |
Where GAMP Lifetech helps
The modules behind Revised Schedule M records
- QMSComplianceOneQuality Management SystemDeviations with root cause analysis, CAPA with effectiveness checks, change control with impact assessment, audits, risk assessment, OOS/OOT, market complaints and vendor qualification: the quality-system core of Revised Schedule M.See the module
- DMSComplianceOneDocument Management SystemSOPs, BMR/BPR and protocols from template to archive, with controlled issuance and electronic signatures.See the module
- TMSComplianceOneTraining Management SystemRole-based training, with retraining raised automatically when a revised SOP is approved.See the module
- UAMComplianceOneUser Access ManagementAccess to computerised systems, instruments and equipment requested, approved and removed through one recorded route.See the module
- FMSFacilityOneFacility Monitoring SystemContinuous temperature monitoring of warehouses, cold rooms and stability stores, with SMS and email alarms.See the module
- LIMSLabOneLaboratory Information Management SystemA LIMS for the QC laboratory, bringing samples, results and approvals into one system.See the module
Every GAMP Lifetech module keeps its own computer-generated audit trail, electronic signatures and role-based access, with single sign-on across the suite through System Administrator.
FAQs
Questions people ask about Revised Schedule M
What is Revised Schedule M?
It is the revised good manufacturing practice standard in Schedule M of India's Drugs Rules, 1945, notified on 28 December 2023 through the Drugs (Amendment) Rules, 2023. It adds a pharmaceutical quality system, quality risk management, product quality reviews and validated computerised systems, bringing Indian GMP close to WHO GMP.
What is the deadline for Revised Schedule M compliance?
Large manufacturers (turnover of ₹250 crore or more) had six months from notification, to 28 June 2024. Small and medium manufacturers had twelve months, to 28 December 2024, and those that applied for more time in Form A by May 2025 had until 31 December 2025. All of those deadlines have passed, and inspections against the Schedule are under way.
Does Revised Schedule M apply to MSMEs?
Yes. Under G.S.R. 127(E) of 11 February 2025, manufacturers with turnover below ₹250 crore could apply to the Central Licence Approving Authority in Form A within three months, with a section-wise gap analysis (plant, equipment, laboratory equipment, HVAC, utilities, technical staff, documentation) and an upgrade plan, for an extension to 31 December 2025. That extension has ended.
Does a WHO-GMP certificate exempt a site from Revised Schedule M?
No. Revised Schedule M applies to every licensed manufacturer. Form A asked whether a site held WHO-GMP certification, but that did not exempt it. A site already working to WHO GMP will find most of the Schedule familiar, but still has to meet it.
Is Revised Schedule M the same as WHO GMP?
It is closely aligned with WHO GMP, but it is Indian law under the Drugs Rules, enforced by CDSCO and the state regulators, and it has its own product-specific parts. Check against the Schedule itself rather than assuming a WHO GMP system covers everything.
Does Revised Schedule M cover computerised systems?
Yes. Computerised systems are one of the main principles in Part I. Systems used in GMP must be validated, existing systems included; access to enter or change data must be controlled; manually entered critical data must be checked; and data must be backed up securely so none is lost.
What changed in the October 2026 draft amendments?
CDSCO published draft amendments for comment covering Grade A microbial contamination limits aligned with WHO (G.S.R. 953(E)), an authorised person responsible for batch release (G.S.R. 955(E)), and suspension of a product's permission when a drug is found not of standard quality, until CAPA is implemented (G.S.R. 956(E)). They are drafts, not yet in force.
Keep reading
Next, read these
- 21 CFR Part 11When electronic records and signatures can replace paper and ink for FDA-regulated work.
FDA
USPart 11
15 requirements9 min read - ALCOA++The ten qualities that make a GxP record trustworthy, on paper and in software.
FDA, MHRA, PIC/S, EMA
GlobalALCOA++
5 requirements5 min read - WHO GDPStoring and moving medical products in range: mapping, monitoring, vehicles and records.
WHO
GlobalGDP
8 requirements6 min read
From the library
Official sources
This guide explains Revised Schedule M in plain words; it is not legal advice. Check the current official text before acting on it, and remember that compliance depends on how a system is validated and used, not on the software alone. Last updated .


