Revised Schedule M, explainedIndia's GMP rules, rewritten to the global standard

Revised Schedule M is the GMP standard every drug manufacturer in India must now meet. Notified in December 2023, it brings Indian GMP close to WHO GMP: a pharmaceutical quality system, quality risk management, product quality reviews, controlled change, investigated deviations, effective CAPA and validated computerised systems. The last extensions ended on 31 December 2025, inspections against it are under way, and new draft amendments followed in October 2026.

Issued by
Ministry of Health and Family Welfare: Schedule M of the Drugs Rules, 1945, substituted by the Drugs (Amendment) Rules, 2023 (G.S.R. 922(E), 28 December 2023)
Applies to
Every licensed drug manufacturer in India. Part I applies to all; later parts add requirements for specific products, such as biological products and hazardous substances
Enforced by
CDSCO and the state drug regulators; inspections against it since the deadlines passed

In plain words

What Revised Schedule M is about

Schedule M is the part of India's Drugs Rules that defines good manufacturing practice. Its revised title is "Good Manufacturing Practices and Requirements of Premises, Plant and Equipment for Pharmaceutical Products". The original concentrated on premises, plant and equipment. The revision keeps that, and adds the quality-system approach of WHO GMP: Part I sets out the main principles for every manufacturer, from the pharmaceutical quality system to computerised systems. Later parts add requirements for specific product types, such as hazardous substances, biological products, radiopharmaceuticals and phytopharmaceuticals.

For most plants the biggest change is not the building but the system around it. Quality events must run as a connected process (deviation, investigation, CAPA, change control) with records that show it. Each product's quality must be reviewed regularly, and the computerised systems used in GMP must be validated and controlled.

The deadlines have passed. In November 2025 the Drugs Controller General of India asked state regulators to inspect manufacturers against Revised Schedule M and report back, and units that do not comply risk regulatory action. Further draft amendments were published for comment in October 2026.

What it asks for

The requirements, clause by clause

  1. Part I

    Pharmaceutical quality system

    A documented quality system with management responsibility, covering deviation handling, CAPA and regular product quality reviews of each product.

  2. Part I

    Quality risk management

    Risks to quality assessed and controlled systematically, with the effort in proportion to the risk.

  3. Part I

    Change control

    Every change assessed for its impact before it is made, approved, and tracked to completion.

  4. Part I

    Qualification and validation

    Equipment, utilities, processes, cleaning methods and computerised systems qualified or validated for their use.

  5. Part I

    Complaints and product recalls

    Complaints and adverse reactions reviewed and investigated, and a recall procedure that works when needed.

  1. Part I

    Self-inspection and supplier audits

    Regular self-inspection and quality audits, with suppliers audited and approved.

  2. Part I

    Personnel and training

    Qualified staff in key positions, trained for their work, with training kept current.

  3. Part I

    Documentation

    Controlled documents and complete records of every batch and activity.

  4. Part I

    Good practices in quality control

    Controlled sampling, testing, specifications and records in the QC laboratory.

  5. Part I

    Computerised systems

    GMP computerised systems validated, existing ones included; access to enter or change data controlled; manually entered critical data checked; and data backed up securely so none is lost.

Where inspections find gaps

Where sites usually slip

  • A quality system on paper onlyProcedures exist, but there is no management review and CAPA is never checked for effectiveness.
  • Shallow investigationsDeviations closed without a root cause, so the same deviation comes back.
  • Change first, approval laterChanges made before they were assessed and approved.
  • No product quality reviewNo PQR, or one that lists data without analysing the trends.
  • Training behind the SOPsTraining records that do not match the current SOP versions.
  • Uncontrolled systemsComputerised systems with shared logins, no audit trail or no backup.

What to ask of software

Questions for any vendor

0 of 6
Ask for a demonstration of each, not a yes.

At a glance

Revised Schedule M timeline

The dates that set where Indian manufacturers stand today, from the Gazette notifications and CDSCO's own list.

Revised Schedule M timeline
WhenWhat happened
October 2018Draft revision of Schedule M published for comment (G.S.R. 999(E))
28 December 2023Revised Schedule M notified in the Drugs (Amendment) Rules, 2023 (G.S.R. 922(E))
28 June 2024Deadline for large manufacturers (turnover of ₹250 crore or more): six months from notification
28 December 2024Original deadline for small and medium manufacturers (turnover below ₹250 crore): twelve months
11 February 2025G.S.R. 127(E): small and medium manufacturers could apply to the Central Licence Approving Authority in Form A within three months, with a section-wise gap analysis and an upgrade plan, for more time
November 2025The Drugs Controller General of India asks state regulators to inspect against Revised Schedule M
31 December 2025Extended deadline for small and medium manufacturers ends
October 2026Draft amendments published for comment: Grade A microbial limits aligned with WHO (G.S.R. 953(E)), an authorised person responsible for batch release (G.S.R. 955(E)), and suspension of product permission for not-of-standard-quality drugs until CAPA is implemented (G.S.R. 956(E))

At a glance

From requirement to system

What each expectation needs day to day, and where software carries it.

From requirement to system
Revised Schedule M expectsDay to day, that meansGAMP Lifetech module
Deviations, CAPA, change control, complaints, auditsOne closed loop, with root cause, effectiveness checks and impact assessmentQMS
Controlled documentationSOPs, BMR/BPR and protocols issued under control; old versions withdrawnDMS
Trained, current staffRole-based training, with retraining when an SOP changesTMS
Controlled computerised systemsAccess granted, changed and removed through a recorded approvalUAM, System Administrator
Controlled storage conditionsWarehouses, cold rooms and stability stores monitored, with alarmsFMS, FMP
Quality control recordsSamples, results and approvals recorded and traceableLIMS (LabOne)

FAQs

Questions people ask about Revised Schedule M

What is Revised Schedule M?

It is the revised good manufacturing practice standard in Schedule M of India's Drugs Rules, 1945, notified on 28 December 2023 through the Drugs (Amendment) Rules, 2023. It adds a pharmaceutical quality system, quality risk management, product quality reviews and validated computerised systems, bringing Indian GMP close to WHO GMP.